Saturday, July 31, 2010

It's Like Christmas Every Day

It's so cool to see the house going up. For so long it was just a hole in the ground. Now every day we go see it there is something new. It's very rewarding after all that waiting. Today the framers got the garage walls up, and almost all the interior walls are done, so we can see what the layout is like.

Seeing it on paper is totally different from seeing it in 3-D. But so far everything seems great. Of course there are going to be things that will probably not translate well from paper to actual house, but so far nothing too horrible has come up. We did have one glitch; the furnace was supposed to be in the mechanical room which is in the basement on the side of the stairs. Our framer told us that it isn't a good spot for it because the HVAC guy would have to do a lot of extra duct work to get around the stairs and that would result in some reduction in efficiency. So Mike went over and met with Tony (our framer) and the HVAC guy and they decided to use a closet in the basement that is in a better location for the furnace.

Monday the front porch and garage stairs will be poured and the trusses will be delivered. Then on Tuesday, Tony will start putting the roof up.

We met our neighbors 3 houses down today--the Passeys. They are really nice, and have 2 of adorable kids they have adopted--the little girl (about 3) is from mainland China, and the 16 mo. old little boy is from Taiwan. Everyone we have met on our street is so nice. It's good to know we are moving into a good area with good people. We like our neighborhood now, and we would hate to go to all this trouble and then find out we didn't have nice neighbors!

The garage

View from Megan's window

Main floor kitchen looking toward bedrooms & laundry room

Stair treads would be nice!

Mike standing in basement family room

Friday, July 30, 2010

We Have Walls, People!

The walls are starting to go up!

Monday, July 26, 2010

I'm a little behind. Here are pics of the radiant floor heating tubes that were installed before pouring the basement floor. Should be toasty warm this winter!

Dirt Pile Gone!

Saturday, July 25: The window wells are installed and back filled. It took 40 dump truck loads to haul away the rest of the massive dirt pile. It's nice to actually be able to see our view now.


The garage floor is poured and the framers started on the basement walls.

Friday, July 9, 2010

Monday, July 5, 2010

Fourth Fun

After a long day of festivities, daddy is worn out! So much for playing Wii with Megan. Luckily he finished his popsicle before falling asleep :-)

Saturday, July 3, 2010

Excavation Complete

Next week it's on to footings and basement walls!